Skip to content
  • How VoltMate worksThe connected workflow from enquiry to invoice
  • A working day in VoltMateFrom the first visit to the invoice
  • All VoltMate featuresBusiness, certification, technical and learning tools
  • Electrical learning hubEarthing, protection, testing, circuits, three-phase and exam revision
  • EICR and inspectionsInspection, observation, compliance and certificate workflow
  • Electrical certificatesPrepare, review, issue and keep traceable certificate records
  • AI Fault FinderStructured AI assistance for electrical troubleshooting
  • Exam practiceLevel 2, Level 3 and specialist electrical revision
  • 3D electrical learningInteractive animated models for core electrical concepts
  • Voltage drop workbenchCheck a twin and earth run against the 3% or 5% allowance
  • CalculatorsVoltage drop, cable sizing, Max Zs and more in the workspace
  • Pricing and plansCompare Free and Pro
  • QuestionsSchemes, phones, cancellation and regulations
  • Help CentreStep-by-step guidance for VoltMate
  • Blog and communityElectrical knowledge, updates and discussions
  • Contact supportGet help with your account or workflow
↑ ↓ to move · Enter to openEsc to close

A connected workspace for electricians

Your trade.
In full flow.

From the first enquiry to the final invoice. Bring clients, jobs, quotes, inspections, certificates and invoices together, and get back to the work you do best.

  • No payment card to start
  • Built for UK electricians

The whole workday.
One workspace.

  • Jobs and clients
  • Scheduling
  • Certification
  • Quotes and invoices
  • AI assistance
  • Technical knowledge

01 / Work, without the disconnect

One job.
Everything connected.

Less jumping between tools. More getting things done. A clear path from your first conversation to your final paperwork.

02 / A day in full flow

One working day.
Every step recorded.

Follow a working day through VoltMate. Each step leaves a record the next one can use, from the first visit to the invoice.

  1. Your day, already planned

    Today’s visits and the job notes that go with them, on your phone before you start the van.

    Jobs and calendar
  2. On site, not on paper

    Circuit details, test results and observations go into the inspection as you work.

    Inspection record
  3. Observations, worded clearly

    Describe what you found. The assistant suggests clear wording and a classification for you to confirm.

    You make the final call
  4. Certificate reviewed and issued

    Check the certificate before issue, then send it to your client.

    Version history kept
  5. Invoice from the quote

    Create the invoice from the accepted quote, so the prices are not typed twice.

    Linked to the job

03 / Take a look inside

A little clarity. Every morning.

Your next job, the paperwork still open and where the business stands, at a glance.

Good morning.

Here’s what’s happening in your workspace.

Jobs today
Quotes to follow up
Awaiting payment
09:00 · Consumer unit inspectionScheduled
11:30 · EV charger installationIn progress
15:00 · Final testing and handoverTo review
Every next step, in one place

04 / Try the workbench

Will the run
drop too far?

A quick voltage-drop check for a twin and earth run, the kind you do in the van. Change the cable, the length and the load.

Cable size
Circuit

Voltage drop · 230 V supply

Worked out in your browser
02468
9.00 V3.91% of 230 V · allowance 5% (11.5 V)

Within the 5% allowance for power circuits.

2.5 mm² twin and earth · 18 mV/A/m · rated 27 A clipped direct

Uses tabulated mV/A/m values for 70 °C thermoplastic flat twin and earth, clipped direct, with the 3% and 5% allowances for a public low-voltage supply. It is a quick check, not a circuit design: the installation method, correction factors, the protective device and Zs still need to be confirmed.

Open the full calculator
Illustration of a wall-mounted EV charger on a brick house beside the front door
Built around the work you actually do.

05 / Made for the real world

On site.
On track.
In your element.

A tidy workspace for busy working days. Practical tools, technical knowledge and thoughtful details, ready when the job calls.

06 / Simple pricing

Start free. Add Pro when the work needs it.

Start with the everyday business tools. Pro adds inspection, certification and connected technical workflows.

Save £58 a year

Free

The everyday tools to organise your business.

£0/month

No payment card required.

What’s included

  • Clients, jobs and calendar
  • Quotes and invoices
  • Materials and equipment
  • Public certificate verification
Get started free
Full workflow

Pro

Inspection, certification and technical support.

£29/month

Monthly plan. Review your account’s billing options in Billing.

Everything in Free, plus

  • Inspection and certificate workflows
  • Reusable templates
  • AI-assisted tools
  • Regulatory Intelligence
  • Analytics, audit trail and exports
Explore Pro

Manage the options available to your account in Billing. See the Terms and the cancellation and refund policy.

07 / Before you sign up

Questions worth answering clearly.

Need help before choosing?

Tell us what you need from VoltMate and we will point you to the right information.

Contact support

support@voltmate.co.uk

01Do I need to be with a competent person scheme to use VoltMate?

VoltMate supports record keeping and workflow. It does not provide qualifications, scheme registration or approval, and it does not replace the legal requirements that apply to your work.

02Can I use VoltMate on my phone?

Yes. VoltMate works in a mobile browser as well as on a tablet or computer. Keep an internet connection for saving and issuing records; do not rely on offline synchronisation.

03Where can I check cancellation and access rules?

Your Billing page shows the plan and subscription options for your account. Check the Terms and the Refunds & Cancellations policy for cancellation, access and refund details, or contact support before changing your plan.

04How does VoltMate support regulatory awareness?

VoltMate can bring UK-focused references and technical support into the workflow. Always confirm the standard, amendment, jurisdiction and manufacturer information that applies to the work; software does not guarantee compliance.

05Can I discuss requirements for my business?

Yes. Contact VoltMate with your business requirements before relying on any specific team or account setup.

06How do I get started?

Create an account, add your business details and start with a customer or job. The Help Centre explains the available workflows and how the parts fit together.

Make room for better work

Your next chapter
starts here.

Bring the commercial work, technical records and day-to-day admin into one connected workspace.

Get started free